Exibindo 373–384 de 562 resultadosClassificado por popularidade
Satloc develops the world’s most advanced GPS Guidance and Flow Control products for the aerial application market. As a technology leader, we offer simple and advanced systems that are versatile, flexible, and easy to use. Satloc is a pioneer in the aerial guidance market. With the addition of technologies from Del Norte and other company acquisitions, Satloc has created the standard for quality, innovation, and service.
Processing time: 3-5 Days after P.O
Sensor Category : CHT
Sensor Mount : Bayonet
Resistance : 57 Ω
Weight : 0.12
BAYONET, RTD Copper. Overall length approx. 15″
Processing time: 3-5 Days after P.O
Processing time: 3-5 Days after P.O
Sensor Category: CHT
Type : J – Black and Yellow
Sensor Mount : Gasket
Resistance : .13 + .16 Ω – .05 Ω
Weight : 0.12
Size : 18 mm
Grounded or Ungrounded? : Grounded
Sensor Stagger : Normal
Intended for use with Type J CHT instruments and leads.
Gasket style design fits standard 18mm spark
Processing time: 3-5 Days after P.O
R$ 4.472,27
PROBE: EGT,TIT, CLAMP,UNGROUNDED
Processing time: 3-5 Days after P.O
PROBE: EGT,CLAMP,NORM STAGGER, TYPE K,MODEL A
Processing time: 3-5 Days after P.O
BOX OF 10 UNITS
SPECIFICATIONS
• Suitable For Use With: 30-95, 30-95A, 30-95B, 30-99, 30-100, 30-28D Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
BOX OF 10 UNITS
SPECIFICATIONS
• Suitable For Use With: 30-23, 30-23A, 30-23B, 30-23C, 30-23D, 30-129 Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
BOX OF 10 UNITS
• Suitable For Use With: 30-30, 30-55, 30-55B, 30-79, 30-79A, 30-79B, 30-214, 30-214B, 30-224 Brake Assembly
• Domestic/Import: Import
Processing Time: 3-5 Days after P.O
Champion Aerospace Box of 12 RHM40E Massive Piston Spark Plug
Lead time 3-5 Days
Champion Aerospace Box of 12 RHM38E Massive Piston Spark Plug
Lead time 3-5 Days
Champion Aerospace Box of 12 RHB32E Massive Piston Spark Plug
Lead time 3-5 Days